If you’re planning to relocate your mobile home in Colorado, one of the first questions you’ll likely ask is, “How long will it take?” While every move is different, having a realistic mobile home moving timeline can help you plan better and avoid unnecessary stress.
Below, we break down the stages of a mobile home move in Colorado and the factors that can speed up—or slow down—the process.
Average Timeline for a Mobile Home Move in Colorado
- Planning & Permits: 1–3 weeks
- Site Preparation: 3–7 days
- Disconnection & Setup for Transport: 1–2 days
- Actual Transport: Same day (for local) or 1–3 days (for long-distance)
- Reconnection & Leveling: 2–4 days
Factors That Affect the Moving Schedule
1. Distance of the Move
Local moves within the same county (e.g., Denver to Aurora) can be completed faster than cross-state or interstate trailer transport.
2. Size & Type of Mobile Home
Single-wides are generally quicker to move, while double-wides often require splitting into sections, which adds extra days.
3. Permit Processing Times
Colorado requires permits for mobile home transport, and delays can happen if paperwork isn’t submitted correctly.
4. Site Readiness
If your new lot isn’t level or utilities aren’t in place, setup can be delayed.
5. Seasonal Conditions
Winter weather in mountain counties like Summit and Eagle can slow down both transport and setup.
Example: Local Move in El Paso County
A typical Colorado Springs to Fountain move might look like this:
- Week 1–2: Secure permits, prepare both sites
- Day 1: Disconnect utilities and prep the home
- Day 2: Transport home to the new site
- Days 3–5: Reconnect utilities and complete skirting/leveling
Plan Ahead for a Smooth Move
Working with experienced mobile home movers in Colorado ensures your timeline is realistic and achievable. They’ll coordinate permits, logistics, and setup so you can get settled faster.
📌 View Our Services to learn how we can handle your Colorado mobile home move from start to finish.